Restaurant Buildout Spring TX – From Kitchen to Dining Room
🍽️ Restaurant Construction Specialists
Fast Casual • Fine Dining • Bars • Coffee Shops • Food Trucks
Restaurant Buildout Calculator
Select Type
Fast Casual
Full Service
Fine Dining
Bar/Lounge
Coffee Shop
Bakery/Cafe
Select Kitchen Size
25% – Small Kitchen
33% – Standard Kitchen
40% – Large Kitchen
50% – Production Kitchen
Commercial Kitchen
- Hood ventilation systems
- Grease traps & interceptors
- Walk-in coolers/freezers
- Fire suppression systems
- 3-compartment sinks
- Equipment connections
Dining Areas
- Custom booth seating
- Bar construction
- Lighting design
- Sound systems
- POS stations
- Host stands
Health Compliance
- Health dept approval
- ADA compliance
- Hand wash stations
- Floor drains
- Non-slip flooring
- Pest control prep
Permit & Inspection Timeline
✓ Building Permit: 2-3 weeks
✓ Health Department: 3-4 weeks
✓ Fire Marshal: 2-3 weeks
✓ TABC (if applicable): 4-6 weeks
✓ Final Inspections: 1-2 weeks